Friday, May 16, 2014

(29) Operable 5-stamper Macraes Flat, New Zealand



April 9, 2014

Every time I visit a mill I record and write up a report that night. Following are my notes on the Golden Point battery near Macraes Flat, New Zealand:

We drove over to Macares Flat and found the 5-stamper, Kevin Pearce and Helen Jones who work for the Department of Conservation, similar to the Forest Service in the States. We got there at about 10:30 and they were in the middle of heating up the engine. The engine is a kerosene engine that has to be heated up hot enough to make the kerosene injection flash and run the engine. The engine is a Tangye Type, AA oil engine.  It took about 2 hours to heat it up properly. The mill is a 5-stamper with a feeder that works. There was also a shaker table that they had just restored back to operations. The entire setup was original including the engine that the Department of Conservation restored back to operations. This cost them $30,000 to complete. I was a little disappointed that the stamps were not dropped, but at least I got some good still pictures and video for my files.

There is a 5 minute You Tube video that I have and will put it in this file of the engine and stamps being dropped.  Just click on the address blow and paste into the Internet and it will play.

The picture below shows the original stamper battery mill in the background with Kevin walking toward the camera. You can see the exhaust from the engine (left) and the sliding door is where the ore carts would bring the material to crush in the stamper battery. 



The picture above shows the stamper battery with the screen removed, exposing the stamper shoes. You can see the middle 3 shoes have fallen off their bosses. That is one of the reasons why we did not drop the stamps today. The picture below shows Kevin removing material from the mercury slots. This sluice table is unlike anything in the States, since it has grooves across the table in about one foot intervals. He uses a special spoon to get down into the slots to remove the concentrates. 




The picture above shows the engine warming up and all of the smoke from the kerosene pre-heater. The large container on top of the engine is the fuel tank. The picture also shows the many engine controls on the side towards the back of the cylinder. The picture below shows you the kerosene pre-heater fire inside the shroud. This took 2 hours to warm the engine cylinder enough to start the engine.


Kevin showed me some original tools including a key, and two tools for removing shoes and tappets. 


Kevin set the 5 stamps on jackstands using a chain fall. This was done since they could not drop the stamps since three of the shoes had fallen off the stamps. Setting the stamps on the jackstands is a typical operation performed on the stamper batteries.


The feeder device on this machine still works. The feeders are very important since they control the level of material in the mortar boxes. If you do not feed enough the stamps will damage the mortar box by the metal on metal action between the stamps and the dies in the mortar box. If you feed too much material you do not get proper crushing action, so it is very important to maintain the correct feed rates. The feeder does this very effectively. The picture below shows the feeder friction wheel.



I found the operation of the sliding clutch to engage the stamper battery into operation quite interesting. The picture below shows how this is done.
 
 
There were several parts to a Huntington Mill in the area. It had been re-assembled to show what it looked like originally. The quartz mill crusher was driven with a pelton wheel.
We went into the town of Macraes Flat and found a 3-stamper that was in pretty good shape. It was made by A & C Price, Thames, NZ, 1896. It did not have a feeder and there was no driver in sight.

 
Gas Tank
 

(28) How to Restore a Shaker Table



There are different sizes and shapes of shaker tables. There are at least two basic types and they are Finishing Tables and Roughing Tables. The roughing tables are much larger than the finishing tables, at least 6’ X 14’ and finishing tables much smaller. This shaker table is presently on display at the Cave Creek Museum in Cave Creek, AZ.

The style shaker table that I’m going to be discussing is the finishing table. This table was originally used at the Golden Reef Mine millsite, 10-stamp mill on Continental Mountain. It was in bad shape with all of the major timbers on its undercarriage rotted and the table top totally rotted away. The restoration was a total rebuild.


The table top was originally a wood deck that was covered with linoleum. Linoleum was discovered in 1855 in England and was brought to the US in 1872. Linoleum flooring is made from natural materials like linseed oil, recycled wood flour, cork dust and limestone. This material was used on kitchen floors in the 1950’s because it was very water resistant, very resilient and provides a slick and durable surface.  
Basic Shaker Tables The two basic deck types are rectangular and diagonal. Rectangular decks are roughly rectangle shaped with riffles parallel to the long dimension. Diagonal decks are irregular rectangles with riffles at an angle (nearly diagonal). In both types, the shaking motion is parallel to the riffle pattern. The diagonal decks generally have a higher capacity, produce cleaner concentrates, and recover finer sized particles. The decks are usually constructed of wood and linoleum, rubber or plastics usually cover the top of the deck. These materials have a high coefficient of friction, which aids mineral recovery. Expensive, hard wearing decks are made from fiberglass. Both the deck surface and riffles on these units are formed as part of the mold. In operation, slurry consisting of about 25% solids by weight and is fed with wash water along the top of the table.

Dis-assembly of the original Table The first thing that needs to be done is to determine what parts need to be replaced. The table frame can be made from metal or wood. In our case the frame was wood and needed to be totally replaced. We made sure that we had several pictures of the frame below.
 Large Components You should lay out the major beams below to show the orientation of the beams. The picture below shows the orientation of the timbers and the size of timbers needed for the frame. It is important that these beams are structurally sound, since the shaker table vibrates at about 200 shakes per minute.
Drawings of the lower frame: You should make a drawing of the frame to mimic the original layout of the base for easier fabrication of the new beams.
Start assembling the new parts installing the shaker boxes on the lower frame and the shaker box tops on the upper frame as shown below:
 Once the two pieces have been assembled they should be put together to verify that the two pieces match and will actually allow movement back and forth. After this is completed the upper frame will be removed for the installation of the shaker mechanism.
The timbers must be bolted to the lower frame, this includes the center timber
The shaker table needs to be placed back on the lower frame and the driver mechanism needs to be repositioned and connected to the upper frame. This requires that you bolt the mechanism on the two timbers and then slide it into the lower frame as sown below:
A fiberglass shaker table top was donated to the museum and that was fastened to the upper frame.  This had to be fastened with elevator bolt with flat tops. The table had to be countersunk to insure that the table surface was flat without any high spots.
The table had to be re-epoxy with a gray color epoxy and then several coats of clear epoxy was applied to make the surface smooth and free from bumps, with exception of the riffles.

(27) Operable 5-Stamper, Cromwell, New Zealand



Gold Fields Mining Centre
5-Stamper Battery
Cromwell, NZ

April 7, 2014
We left Cromwell and stopped at Gold Field Mining Town. They had a stamper that operates. I talked with two workers that ran the mill and they were knowledgeable. Warren Horncastle horncastle.electrical@xtra.co.nz    and David Henderson. They were very interested in Stampers and we talked about the mills in the US. The mill is a 5-stamper with an operational feeder and it worked quite well. 

I have a You Tube video that shows the operation of this stamper battery. All you have to do is click on the address below and paste into the Internet.
https://www.youtube.com/watch?feature=player_detailpage&v=lb74UX88qmM 

The picture below is a shot from the front of the mill. It is an “A” frame design and (red circle) has a Hendy type feeder that still works. The timbers were replacements because when it was found the timbers were completely rotted away. You can see the small retort that was used to remove the gold from the mercury amalgam during operations. They ran the mill for some time and it worked very well, including the feeder, Berdan Wheel and the operation of the monitor.


The picture below is a shot of the bull wheel. It is a lot different from the US mills. Many of the mills in Australia and New Zealand used this principle. Using the two geared wheels gave the operators a greater mechanical advantage to allow starting the mill with the cams engaged. The States used a large bull wheel and also jackstand devices to start the mill with the cams disengaged and then drop one stamp at a time to allow the centrifugal force of the bull wheel to keep the speed up on the mill.  This mill was driven by a 3’ pelton wheel supplied with water from a lake about 30 meters (90’) above the mill. 


Discussions with David indicated that this stamper battery came from the Invincible Mine that is located in the Otago Goldfields Park about a 30 minute drive up Rees Valley Road from Glenorchy. There are remains of a water wheel and (7) Berdans that were used in the gold reclamation process that are shown below.

They also had a Berdan wheel in operation at the Cromwell site. There were several Berdan wheels that were used at the stamper battery sites in Australia and New Zealand. The Invincible Mine site has (7) berdan wheels in a row. This was an important part of the process with stamper battery’s.
The Berdan wheel below has a stationary slug in the bowl, but many of the original bowls had a large round steel ball that was used to crush the ore. The reason why they used the stationery slug was that it would crush the material rather than roll it as would be the case with the large steel balls. The miners liked the actions with the slug and that is why you see many modifications of the Berdan bowls.
 


Thursday, May 15, 2014

(26) Operable 5-Stamper Battery Reefton, New Zealand



Golden Fleece 5-Stamper
Blacks Point Museum
Reefton, New Zealand

Every time I visit a mill I record and write up a report that night. Following are my notes on the Golden Fleece battery near Reefton, New Zealand:

April 5, 2014

We arrived at Reefton at about 11:30 and stopped at the first stamp mill site at Black’s Point Museum. I talked with Curator, Peter Lawn and Bill Watts, who was involved with moving the battery to its present location in the 1970’s, about the stamp mill that was on site. The museum’s Website is reeftoninfo@xtra.co.nz . I also talked with a person by the name of Cory that copied my thumb drive information. He was coming to California in the summer and wanted to visit stamp mill areas.  I sent him an Email via the museum and he responded that he received it.

Bill told me the original mine on this location was long removed. The present mill building was built right over where the cyanide tanks were located. You could still see the foundations of the cyanide tanks. I talked with Bill Watts, who was involved with the original set up of the new mill and he said that the current stamp mill came from the Golden Fleece Mine and was brought to the present location partially by helicopter since it was so far back in the bush. He talked about the 24” water line that brings water from a pond about 60’ above the current mill. You would think that it was the original pipe, but no, it was installed in the 1970’s when the Golden Fleece stamper was moved on site. They were amazed by the water’s caustic nature and ended up getting leaks in the line several years after installation. They buried a new supply line under the original line to supply the 2 pelton wheels to run the current mill.   
I have done some further investigation on the history of the mill and the picture below shows the mill when it was operating:


The 5-stamped battery is powered by a pelton wheel. The mill was called the Golden Fleece Stamper Battery and was transferred a few miles from a local mine. Some was transported by helicopter. The stamp mill that was originally on site was removed many years ago. The pelton wheel actually works and is supplied from a pond about ¼ mile up the hill in back of the mill building. The stamper was manufactured at the Langland Foundry, Melbourne, Australia. The original mill was about 100 yards north from the present stamper building. The only remnants are the foundations of the 10-stamper battery. The cyanide tanks were located where the present building is located. The picture below shows the present location of the stamper battery.
The picture below shows the 5-stamper battery with the mercury sluice and carpet sluice tables in the foreground.
I have a You Tube video of the operation of the above 5-stamper battery being run by pelton wheel power.
All you have to do it copy the address below and paste on to the Internet.

https://www.youtube.com/watch?feature=player_detailpage&v=92oDQt8J48U


There is a 14” water pipe that delivers the water to the mill building from the pond about 30 meters above the mill building. They also had a Berdan wheel that would crush the ore down to a fine powder. The Battery had a copper plate to remove the gold and then a set of plates with a carpet installed. The table was divided down the center to allow one side to be cleaned while the other continued to operate. They would take the concentrates in the rug and put it into the berdan wheel with a cup of mercury that would crush and the mercury would absorb the exposed gold.  There were quite a few Berdan wheels seen on the trip and were used along with the stamper batteries.

I will discuss the operation of the stamper battery in conjunction with the Berdan Wheel. I have only seen one Berdan wheel in the States. It was at the North Star Museum in Grass Valley California. The process was used in Australia and New Zealand and incorporated for the gold that was not captured in the sluice tables. After the material left the sluice table it went over another sluice table with a fabric material that captures the larger gold and concentrates that was missed by the sluice and mercury. They would run the process for awhile and then would bypass one side of the table and remove the rug and put the contents in the Berdan Wheel and would add a cup of mercury to capture the gold. They used either a large steel ball about 10” in diameter or a steel slug that was suspended so that the slug would be stationary and grind down the material into a very fine powder. I have seen the Berdan Wheels at several of the stamper Battery’s in both Australia and New Zealand. The following is a picture with the process described:
 



 


In addition, there was a one stamper battery a mile from the Black's Point Museum. We went into  Reefton and visited the Bearded Mining Co. Ltd. 
located on main street and the owner had a single stamper (right) that was run with a  motor, but could also be run manually. It had a cylinder that moved the stamp up and down and you need to manually feed the stamper. 
















Friday, May 9, 2014

(25) Operable 12-Stamper Battery at Beaconsfield, Tasmania



I have been out of the Country in Australia and New Zealand for awhile and have recently returned. I will be writing up some articles for my blog and will post them as I get them completed. Of course, the main goal of the trip was to document all of the stamp mills I could find and video tape the operable ones. I spent several months studying the three areas that we visited and marked out the promising spots for stamp mills. They call them Stamper Batteries Down Under.

The first location I will discuss is Beaconsfield, Tasmania, which was in the northeast part of the island. Mining was reported back as far as 1872 on the site where there was an iron smelter that supported the Australian steel industry. There were steam driven water pumps on the site back in 1905. They are thought to be the largest of that type ever built. The Tasmania Gold Mine Company was on site until 1914.

The 12-stamper battery known as the “Chintock”, presently located at the Beaconsfield Mining & Heritage Centre, was brought to the site from a remote location North East from Beaconsfield on the Blue Tier near Weldborough.  According to notes made several years ago by a former volunteer at the center, who did some research on the battery, there are only records of the Vivian foundry making one 24 head battery and one 12 head battery. It is not clear how complete the company records are. The volunteer felt that the battery at the museum was likely to be part of the 24 head battery, as the battery standards on the battery consist of one end and two intermediate standards, a configuration suggesting it was part of a larger set. If this is the case, the battery was made in 1862 and first used by the “New Chum” gold mine at what is now Stawell in Victoria. The volunteer also traced records of stamp batteries in multiples of six that were used in northeastern Tasmania. They were:

Mount Victoria Gold Mine Co.  18 stamps            1888-1895
New River gold mine                12 stamps            1900
Mara gold mine                         12 stamps            1901

I have been communicating with Julienne Richards, Collections Curator. She has been very helpful getting information that I did not pick up during the tour. We have been communicating by Email. She has sent pictures of the unusual tappets that they use on the 12-stamper on site.

The following is the report that was assembled for Beaconsfield, Tasmania


Chintock 12-Stamper Battery
Beaconsfield Mining & Heritage Centre
Beaconsfield, TAS

April 13, 2014

We went to Beaconsfield and there was a 12-stamper on site that ran! It was a very unusual combination of two 6-stamp mills tied together. The mill was built by Vivian & Co., Castlemaine Foundry, Victoria, AU. The battery frame has a label that says it was made by IEE Salisbury, Launceston. TAS. There were no feeders on the mill and it was designed to be fed by hand. The mill was made by Vivian & Company, Castlemaine Foundry, Victoria, Aus. It came from the Chintock ‘Kent” Battery that was located north east from Beaconsfield and brought to the Grubb Shaft Museum, Beaconsfield, TAS. 

I have a You Tube Video of the operation of the 12-satmper Battery taht shows the water wheel operation and 6 of the 12 stamps in action. Just copy the address below and paste on to the Internet.   
 https://www.youtube.com/watch?feature=player_detailpage&v=ulBXZ06m5yE  

The picture below shows the stamp mill profile. 


The mill was run by an overshot water wheel that was fed from a water supply. It was on a timer and to operate the stamper you would push a button and that would turn on the water supply that would activate the water wheel.

There were quite a few things that were different about this mill. It had 12 stamps, a steel geared wheel to drive the mill, threaded tappets, square cone shoes and did not have jackstands. The pictures below show the differences:





The following You Tube video below shows the operation of the 12-stamper and the water wheel that runs it at Beaconsfield Mining & Heritage Centre in Tasmania . All you have to do is copy and paste on the Internet.


https://www.youtube.com/watch?feature=player_detailpage&v=ulBXZ06m5yE


Contact Information address, Beaconsfield Mine and Heritage Centre, P.O. Box 59, Beaconsfield, TAS 7270, Tel: +61-03-63831473, Fax: +61-03-63836384